Civic Issues
Topics getting the most attention in Paradise Valley public meetings, ranked by how frequently they are discussed.
4 issues in development with medium priority
SmokeTree Resort construction and water supply
The long-planned SmokeTree Resort rebuild on Lincoln Drive is about a year behind but moving again: demolition is done, and the developer aims to finish construction by May 2028 and open in summer 2028. Delays traced to the water provider and a utility cabinet that must be screened or moved.
Five Star development inspection services
The stalled Ritz-Carlton/Five Star project is in bankruptcy, but the town extended inspection contracts so services are ready if construction resumes — while tracking about $31,000 in unpaid reimbursements and discussing when it would halt inspections over delinquency.
Pool remodel and view deck at 6043 N. 42nd Street
A covered patio with a view deck above a remodeled pool, with lighting and stone-reflectivity concerns addressed through stipulations. The deck sits where pool equipment was and meets setbacks.
New residence at 5625 E. Indian Bend Road with stormwater rerouting
An 11,742-square-foot home approved with conditions on dwarf olive plants and roof reflectivity. Extensive drainage infrastructure reroutes stormwater away from a downstream neighbor who has historically suffered runoff problems.