Bradshaw Mountain Road Bridge Erosion
Summary
Flood flows from three washes have been eating away at the bridge abutments — and that bridge is the only way in or out of the Quailwood subdivision for about 2,100 residents. The $251,110 design contract is step one toward permanent stabilization.
At a glance
- Total mentions
- 1
- Last 30 days
- 0
Last discussed Sep 10, 2026.
Impact analysis
$251,110 for design now; construction funded at $379,000 in FY 2027 from the stormwater fund.
The roughly 2,100 Quailwood residents who rely on the bridge as their only public access route.