91st Avenue Pedestrian Bridge Construction
Summary
The city locked in the guaranteed maximum price to actually build the pedestrian bridge over the ag channel. This is a real infrastructure project moving from design to construction.
At a glance
- Total mentions
- 1
- Last 30 days
- 1
Discussed at 1 meeting in the last 60 days; most recently Oct 13, 2026.
Impact analysis
Construction is capped at $5,447,758.65 under the guaranteed maximum price.
Pedestrians and cyclists get a safer crossing once the bridge is built.